Grade/Tonnage Curves and Optimization of a Mining Project. information. Not only do the reserves depend on the geological. technical and economical parameters. The objective of the present paper is to show how the method. and versatile tool for characterizing a mining project. After a review of the main properties of the technique, its use.
grade-tonnage curves Alastair J. Sinclair,University of British Columbia, Vancouver,Garston H. Blackwell,Queen's University, Ontario Book: Applied Mineral Inventory Estimation
22/09/2020 Place the Statistics report in the drawing. This report includes the statistics items chosen in the module. Select the “Grade-Tonnage curve” (EDAGTC) command and select the block model (note that this command only works with block models). Hit Enter and configure the parameters in the window: Select the grade type. Input a density.
Forecasting the grade-tonnage curves and their uncertainty at the Mehdiabad deposit-Yazd, central Iran S.A. HoSSeini1, o. ASgHAri1, X. emery2,3 and 2,3m. mAleki 1 Simulation and Data Processing Laboratory, School of Mining Engineering, College of Engineering, University of Tehran, Iran 2 Department of Mining Engineering, University of Chile, Santiago, Chile 3 Advanced Mining
21/01/2016 The area of each prism, which is given in the figure, was calculated by the method just outlined and the results of the calculation of tonnage and grade of the ore content are shown in the accompanying table of calculations. When the trapezoid is divided in this way the two prisms contain 3,099,788.15 metric tons of ore with a metallic content of 55,440.00 tons of copper, or a grade of
Grade/Tonnage Curves and Optimization of a Mining Project. information. Not only do the reserves depend on the geological. technical and economical parameters. The objective of the present paper is to show how the method. and versatile tool for characterizing a mining project. After a review of the main properties of the technique, its use.
> grade tonnage curve in mining; grade tonnage curve in mining . Since its beginning with the works of D Krige and later G Matheron geostatistics has been analyzing in detail the essential factors at play in ore reserves estimation problems with the everpresent aim of an optimal use of the available information Not only do the reserves depend on the geological in situ resources they also
Mining recovery factor (open pit) % 97 98 95 98 95 98 Strip ratio (waste:ore) ratio 6.2 6.6 9.3 MCF % 100 100 100 Dilution open pit % 15 50 2 49 20 40 Dilution underground % 12 25 15 25 5 40 Plant recovery factor % 69 96 78 94 79 94 Processing capacity Mtpa 4.7 4.7 4.7 Grade tonnage curves for the underground and open pit Mineral Resource. 0 0.3
22/09/2020 Place the Statistics report in the drawing. This report includes the statistics items chosen in the module. Select the “Grade-Tonnage curve” (EDAGTC) command and select the block model (note that this command only works with block models). Hit Enter and configure the parameters in the window: Select the grade type. Input a density.
Grade Tonnage Curve In Mining. A grade tonnage curve combines two or three equations together to produce one of the more important tools for analysing the data indicating the potential amount of material obtained when varying the cutoff grade applied leapfrog geo can display multiple grade tonnage curves on one graph. Inquiry Online . pdf Comparison Of Cut. As mentioned earlier geological
Forecasting the grade-tonnage curves and their uncertainty at the Mehdiabad deposit-Yazd, central Iran S.A. HoSSeini1, o. ASgHAri1, X. emery2,3 and 2,3m. mAleki 1 Simulation and Data Processing Laboratory, School of Mining Engineering, College of Engineering, University of Tehran, Iran 2 Department of Mining Engineering, University of Chile, Santiago, Chile 3 Advanced Mining
grade tonnage curve in mining deniseohlson.co.za. mining where the ore grade is highly variable and by selecting out only high grade areas to mine a reduction in cost can be,of the MMD grade tonnage curves would be the mining method and the grade distribution The next step is to.
21/01/2016 The area of each prism, which is given in the figure, was calculated by the method just outlined and the results of the calculation of tonnage and grade of the ore content are shown in the accompanying table of calculations. When the trapezoid is divided in this way the two prisms contain 3,099,788.15 metric tons of ore with a metallic content of 55,440.00 tons of copper, or a grade of
13/01/2019 The data and variogram are the same for both grade tonnage curves, only the support has changed. The 0.175% Cu cutoff grade is below the mean in this example. 7.5m blocks yield 52% of the total tonnage above cutoff at a grade of 0.310% Cu while 15m blocks yield 56% of total tonnage above cutoff at a grade of 0.289% Cu. The value of the recoverable resource for a given selectivity is
Figure 1A: The grade tonnage curve of a magnetite deposit where geology model was used. Figure 1B: The grade tonnage curve of a magnetite deposit where a grade-shell was used. It should be pointed out that in 1b-there is no substantial tonnage reported below a cutoff grade. This cutoff grade is the nominal grade used for constructing a gradeshell. The risk of using the a grade-shell is the
In the mining industry, from the geology and mine planning areas to management, the grade tonnage curve has been applied in economic and financial analysis probably being one of the most important tools used in determining the volume and grade of material in face of variations of the cut-off grade. The grade tonnage curve is usually calculated with the in-situ resources or
> grade tonnage curve in mining; grade tonnage curve in mining . Since its beginning with the works of D Krige and later G Matheron geostatistics has been analyzing in detail the essential factors at play in ore reserves estimation problems with the everpresent aim of an optimal use of the available information Not only do the reserves depend on the geological in situ resources they also
Mining recovery factor (open pit) % 97 98 95 98 95 98 Strip ratio (waste:ore) ratio 6.2 6.6 9.3 MCF % 100 100 100 Dilution open pit % 15 50 2 49 20 40 Dilution underground % 12 25 15 25 5 40 Plant recovery factor % 69 96 78 94 79 94 Processing capacity Mtpa 4.7 4.7 4.7 Grade tonnage curves for the underground and open pit Mineral Resource. 0 0.3
Grade Tonnage Curve: How Far Can It Be Relied Upon? 2 1. Introduction The grade tonnage curve is widely used in the mining industry. From geology and mining planning to management and investment areas they are used for economic and financial analysis
Grade Tonnage Curve In Mining. A grade tonnage curve combines two or three equations together to produce one of the more important tools for analysing the data indicating the potential amount of material obtained when varying the cutoff grade applied leapfrog geo can display multiple grade tonnage curves on one graph. Inquiry Online . pdf Comparison Of Cut. As mentioned earlier geological
Mining recovery factor (underground) % 80 95 80 95 90 95 MCF % 100 100 100 Dilution underground % 18 15 10 Plant recovery factor % 92.6 94.3 94.9 Processing capacity Mtpa 1.3 1.3 1.3 Grade Tonnage Curves The grade tonnage curves for the surface and underground Mineral Resource are presented below. Grade tonnage curve Surface Tonnes above cut-off (millions) Average grade
grade tonnage curve in mining abbaziapertutti Resource estimation is used to determine and define the ore tonnage and grade of a geological deposit, from the developed block model. There are different estimation methods (see below) used for different scenarios dependent upon the ore boundaries, geological deposit geometry, grade variability and the amount of time and money available.
grade tonnage curve in mining deniseohlson.co.za. mining where the ore grade is highly variable and by selecting out only high grade areas to mine a reduction in cost can be,of the MMD grade tonnage curves would be the mining method and the grade distribution The next step is to.
Figure 1A: The grade tonnage curve of a magnetite deposit where geology model was used. Figure 1B: The grade tonnage curve of a magnetite deposit where a grade-shell was used. It should be pointed out that in 1b-there is no substantial tonnage reported below a cutoff grade. This cutoff grade is the nominal grade used for constructing a gradeshell. The risk of using the a grade-shell is the
The tonnage and grade of a second type of sulfide deposit, which is associated with small orogenic intrusions, were also found to be lognor- mally distributed. The median nickel grade of these deposits is 0.60 percent, and their median tonnage is 1.27xl06 metric tons; these variables are statistically independent. The tonnage, but not the grade, of laterite deposits follows a lognor mal